This document provides some idea and knowledge in software engineering and various steps of Point of sale (POS).
Click Here To Download File
Over View
1. Chapter 1: Project
Plan
1.1 Introduction
A
project plan is a documentation that helps for the proper management, execution
and implementation of a project. While starting any project a project plan
needs to be made. A good project plan leads to a successful project.
A
project plan is made and used for the following purposes:
i.
To analyze, calculate
and manage the possible risk factors of a project.
ii.
To properly guide the
scheduling, initiation and progress of the project
iii.
To document the
expectations that the stakeholders have from the product.
(Janssen, 2013)
This
document talks about the requirement analysis, risk assessment, initiation and
progress plans of the POS system that is to be made for Sasto Mart.
Sasto
Mart is a Departmental Store that is located at New Road. Currently the item
sales and transactions are being handled manually and Sasto Mart requires an
automated POS system to handle the transactions easily and better.
The
POS (Point of Sale) System is an application that is to be developed for Sasto
Mart to handle its daily transactions more effectively and easily. It should be
able to handle the payment calculations and generate a receipt/bill at the end
of each payment. A MIS (Management Information System) is also developed to
generate different types of sales report for Sasto Mart.
No comments:
Post a Comment